Stop Absorbing Risk You Didn't Create.
77% of RFIs originate from design defects. Specialty contractors bear the cost of upstream ambiguity. xCONRA gives you early visibility and documented defense.
See Design Gaps Before They Hit Your Scope
When the architectural drawings conflict with the MEP specs, you're the one who pays for the delay. xCONRA flags these gaps before you mobilize, giving you time to clarify scope.
- Early visibility into design gaps affecting your trade
- Spec clarity validation before procurement commitments
- Coordination risk alerts specific to your discipline
- Historical pattern matching from similar projects
MEP Routing Conflict — Level 3 Mechanical Room
Architectural ceiling height (Sheet A-301) conflicts with mechanical duct routing (Sheet M-301). 18" clearance gap will require field modification.
Claims Documentation
Documented Evidence for Change Order Protection
When design defects create field changes, you need documentation. xCONRA provides timestamped, auditable records of every risk finding.
- Timestamped risk findings with audit trails
- Document-referenced evidence for each finding
- Cost impact quantification for dispute support
- Exportable reports for claims and negotiations
Alerts Specific to Your Trade
xCONRA filters risk intelligence to show only what affects your scope, so you can focus on what matters to your bottom line.
Mechanical
HVAC routing, equipment clearances, duct coordination
Electrical
Panel locations, conduit routing, power requirements
Plumbing
Pipe routing, fixture locations, drainage slopes
Fire Protection
Sprinkler coverage, rated assemblies, egress paths
Steel/Structural
Connection details, embed locations, load paths
Drywall/Framing
Wall types, fire ratings, backing requirements
Protect Your Trade. Know Your Risk.
See what design risks affect your scope before you mobilize.